Electric fleets need more than charging points.

Think Voltaic develops charging infrastructure for electric trucks, buses and commercial fleets. We bring together charging demand, grid connection and electrical infrastructure in a coordinated site concept. We include solar PV and battery storage where they make technical and economic sense.

Your charging project starts with your operations.

Assess your site and fleet requirements together with us.

From vehicle schedules to a charging concept.

For logistics sites, bus depots and vehicle yards

  1. 01

    Demand and technical feasibility

    We assess duty cycles, dwell times, energy demand and fleet growth, as well as available space and existing installations. Load profiles, simultaneity and spare capacity form the basis for charging power, charging windows and phases of expansion.

  2. 02

    Grid operator and grid compatibility

    We coordinate the connection request and agree power requirements and the connection concept with the responsible grid operator. Our preliminary assessment does not replace the grid operator's own grid compatibility assessment and connection approval. Connection capacity, the point of connection and any grid reinforcement are clarified with the grid operator.

  3. 03

    Charging hardware and load management

    The choice of charging technology depends on the vehicles and how the site operates. Coordinated load management distributes the available power, taking departure times and the other loads at the site into account.

  4. 04

    Solar PV and battery storage

    On-site solar power and storage can complement the charging concept. We assess their value against the load profile, available space, grid capacity and economic viability. Battery storage does not automatically replace grid reinforcement where it is required.

  5. 05

    Delivery and handover

    Based on the agreed scope of work, we coordinate design, procurement and delivery with the specialist contractors involved. Testing, documentation and handover are considered from the outset. Operation and maintenance are agreed separately.

Three electric buses in a depot yard in front of a hall, one connected to a charger
Bus depot
Charger with a cable connected to an electric truck, a transformer station in the background
Charging infrastructure in detail

A clear path to electric fleet operations.

  1. 01

    Understand the site

    Record the fleet, schedules, electricity consumption and existing infrastructure.

  2. 02

    Assess the options

    Compare charging concept, grid connection, phases of expansion and potential PV and storage integration.

  3. 03

    Prepare for delivery

    Clarify the grid operator's response, scope of work, permits and next steps.

Frequently asked questions

How much charging power does our site need?

That depends on the vehicles, daily energy demand and the time available for charging. The number of vehicles alone is not the deciding factor.

Can the infrastructure grow in stages?

Phased expansion can make sense. The connection, available space and cable routes should be aligned with the planned development at an early stage.

Let's assess your site.

Are you planning electric trucks or buses? Talk to us about your site, your fleet and your timeline. Together, we establish the basis for a viable charging concept.